Aktuelle News & Schlagzeilen

Placebo: Retrospective Tour 2016

UK rental specialist Colour Sound Experiment made some serious investments for the current Placebo “Retrospective” arena tour which features a visual design by Jvan Morandi, for which the west London company is delivering the full lighting, video and rigging package. This includes a new Kinesys automation system; new robo and static video cameras and new Robe Spiider Wash Beam moving lights amongst several other purchases.

Colour Sound’s Haydn “H” Cruickshank says, “We were delighted to win this tour which presented a perfect opportunity for us to expand our video department, invest in comprehensive and sophisticated motion control and expand the extensive moving light stock with the latest Robe technology, together with smoke machines, fans, cabling infrastructure and much more”.

Jvan Morandi has developed an original aesthetic for the show, which highlights 20 years of Placebo at the forefront of the alternative rock movement, coinciding with the release of a new compilation album, “A Place for us to Dream” and the start of this touring and live performance campaign. Jvan wanted a simple clean look for the stage - almost like a lightbox but with moving image. This large video presence on stage is a break from past Placebo tours, on which Jvan has worked since 2005, and his challenge was to make it inventive, interesting and unconventional. He decided on a large screen at the back for impact when needed, also a surface area that can be minimised and changed completely with clever content application. “I needed a video presence on the show but wanted to bring a different, iconic and provocative visuality to assist a real live curation referencing 20 years of incredible work and moments,” he said. Over the years Jvan has always produced fresh and imaginative ideas and looks for his varied client base, and not selling his soul or the heart out of a design is one of his trademarks.

The 18 metre wide by 6 metre high upstage screen is made up of Colour Sound’s BT20 product. Crew Chief James Hind and Frankie McDade - both Colour Sound crew - also designed special touring frames into which the LED screen is fitted to enable quick and expedient deployment and de-rigging/storing for transport. The screen itself is hung on a run of JTE 52cm super truss.

In addition to this, there are five I-shaped trussing pods flown in the upstage/downstage orientation which have 2 x 1 metre frames of BT-7 LED screen on the audience facing ends. The five pods move up and down into several different shapes and positions during the show, each on two Liftket half tonne vari-speed motors powered by Kinesys Elevation 1+ drive units. Two 5 x 6 metre side screens, also BT-7, are flown on JTE super tower truss, finished with three 2 lite moles to connect them to the show.

The playback content has been crafted especially for the tour by Jvan, some of it comprising re-mashed music videos from Placebo’s vast body of work over the years, and some of it brand new graphic style material. The appearance of all the content takes a more cinematic approach, “It’s about 20 years of a ground-breaking indie band who have always pushed creative boundaries musically and lyrically, so I wanted to create a live film playing behind them that helped provoke a new energy for the audience but something that is also relevant”.

The 10-camera package comprises five Panasonic AW-HE60Ss and five AW-HE2S static cameras which are dotted around the stage and clamped to various bits of backline kit. The robo-cams are operated on alternate shows by Frankie and Colour Sound crew member Chris Foot. At FOH fitted with a 76 mm long lens, is an operated Sony HX-100 broadcast camera. All the camera feeds go into a Black Magic Design ATEM 2ME switcher, with the mix cut by camera director Fergus Noble. He’s been involved in various Placebo video aspects since 2007, so he and Jvan enjoy a great synergy. He knows the style and look of shots that Jvan is looking for. The camera feeds then go into the Catalyst media server – together with the playback video – and are mapped to the various screen surfaces. As the requirement – from both the band and Jvan – was for a non-mainstream ‘IMAG’ mix, a range of pre-selected treatments created by Jvan are also applied to the camera signals in the Catalyst, which is triggered by lighting director on the road/operator Hunter Frith, via his Chamsys MQ200 console.

The end result is a stark, stripped back yet fluid collage of moving images evolved by Jvan and Fergus, plus edgy grading, colour and texturing that harmonises with the music, deconstructing the images, combining with the lighting and subverting the expected. The movement of the pods changes the shape and identity of the performance space dynamically, especially during the last third of the set, when they start taking on some extreme angles. "It’s essentially a visual system rather than an IMAG mix", explained Jvan, providing a pivotal visual environment in which the band play that “leaves a lasting impression of Placebo at this seminal point in their career”.

Once the vibe of the video was established to a specific point, Jvan then started adding lighting to the bigger picture.
As with the video, it was all about being off-beat and daring, with lighting fixture placement crucial in maintaining the stylish minimalism of the oeuvre. Each of the pods - in addition to the video screen at the audience end - contains four of Robe’s new Spiider LED Wash Beam product, two Robe BMFL Spots and four Claypaky Stormy LED strobes. The Spiiders are used as the main wash lights covering the band and stage in conjunction with some LEDWash 600s on the front truss. Colour Sound devised custom bracketry to centre the lights to on the pods and fix them solidly for the more acute inclines. A new Kinesys Vector control system was part of the automation package, which has been programmed by James who also runs automation for the show.

The pods are flown on a 6 x 16 metre box mother-grid made up from Litec QL52 trussing, with the rest of the rig on Litec Exerise hoists, part of another major purchase by Colour Sound earlier in the year. The front truss is loaded with eight BMFL Spots, four LED Wash 600s and eight 2-cell Moles, the latter facing into the audience as the show involves plenty of audience interaction. Behind the semi-transparent BT-20 screen at the back is ‘the matrix ‘, a set of three 17 metre long stacked QX30 trusses, each rigged with 12 x Prolights Diamond 7 Beam fixtures and six 2-cell Moles. When these come on they add huge depth to the space and an additional dimension – suddenly shooting through what initially appears to be a solid surface.

On the floor - in a line upstage - are eight BMFL Spots on the deck, 10 x Stormies which are also used for colour washing effects and eight 2-lite Moles. On the downstage edge of the floor are six more Diamond 7s a side, plus three more Spiiders a side for low level cross lighting and effects and also for beaming out into the audience pulling them into the stage action. The central flower effect of the Spiiders is used to texture the audience very effectively.

Atmosphere is another essential visual element with as much attention to detail paid to smoke and haze as to video, lighting and automation by Jvan. It’s provided by six new Smoke Factory Tour Hazer IIs plus two Jem ZR44s and four powerful TMB Pro Fans to move it strategically into the right places. Hunter runs all the show visuals from the Chamsys MQ200 including the Catalyst media server, utilizing three Chamsys Snakesys R8 eight universe Ethernet to DMX convertors and ever reliable pulsar DMX buffers. Other new/special items sourced for the tour include a dimmer dolly along with two 72 way SES power "D type" distros and Outboard motor controllers for the non - Kinesys motors. Joining James, Frankie and Chris on the Colour Sound crew is Aamer Diaz. Keeping everything in check on the road by production manager is Allan Moffat and the tour rigger is Katy Flanders. Adlib is supplying the audio.

Kinesys automation is also central to show designer Morandi’s visual concept: Ten Kinesys Elevation 1+ vari-speed drive units, used with 10 x half tonne Liftket motors and Kinesys Vector control are being used to move five I-shaped trussing pods rigged in the roof above the stage. The system is another brand new investment in automation by Colour Sound. Haydn Cruickshank comments, “We have sub-rented Kinesys systems as needed for some time now, so we know all about the kit.” In addition to the Liftkets, Elevation 1+s and Vector control, the system also includes a Kinesys Array PD-ES and Mentor series 3 for SIL 3 compliance which is required for touring in parts of Europe. The Vector platform is palette based, so updating the positional information each day as the height, shape and dimensions of the stage change is very quick and easy, and any show can be adapted for a venue with lower or higher roof clearance.

Fotos : Louise Stickland


Setlist

Who By Fire (Leonard Cohen) (Intro)
Every You Every Me (Intro)
Pure Morning
Loud Like Love
Jesus' Son
Soulmates
Special Needs
Lazarus
Too Many Friends
Twenty Years
I Know
Devil In The Details
Space Monkey
Exit Wounds
Protect Me From What I Want
Without You I'm Nothing
36 Degrees (slow version)
Lady Of The Flowers
For What It's Worth
Slave To The Wage
Special K
Song To Say Goodbye
The Bitter End

Teenage Angst (slow version)
Nancy Boy
Infra-red

Running Up That Hill (Kate Bush)


Tour (Europe)

13.10.2016 Train, Aarhus, Denmark
14.10.2016 Store Vega, København, Denmark
16.10.2016 Sentrum Scene, Oslo, Norway
18.10.2016 Cirkus, Stockholm, Sweden
20.10.2016 Hartwall Arena, Helsinki, Finland
22.10.2016 Arēna, Riga, Latvia
24.10.2016 Ice Palace, Saint Petersburg, Russia
26.10.2016 Olympic Stadium, Moskva, Russia
29.10.2016 Torwar, Warsaw, Poland
31.10.2016 Barclaycard Arena, Hamburg, Germany
02.11.2016 Lanxess Arena, Cologne, Germany
04.11.2016 Olympiahalle, München, Germany
05.11.2016 Arena, Leipzig, Germany
07.11.2016 Mercedes-Benz Arena, Berlin, Germany
08.11.2016 Forum Karlín, Prague, Czech Republic
10.11.2016 KC Dražen Petroviæ, Zagreb, Croatia
11.11.2016 Sportaréna, Budapest, Hungary
13.11.2016 Stadthalle, Vienna, Austria
15.11.2016 Mediolanum Forum, Milan, Italy
16.11.2016 Hallenstadion, Zurich, Switzerland
18.11.2016 Zénith Arena, Lille, France
19.11.2016 Sportpaleis, Antwerp, Belgium
21.11.2016 Ziggo Dome, Amsterdam, Netherlands
23.11.2016 Festhalle, Frankfurt, Germany
24.11.2016 Schleyer-Halle, Stuttgart, Germany
26.11.2016 Galaxie, Amneville, France
28.11.2016 Zenith Nantes, Saint Herblain, France
29.11.2016 Accor Hotels Arena, Paris, France
02.12.2016 The SSE Hydro, Glasgow, UK
03.12.2016 First Direct Arena, Leeds, UK
05.12.2016 Arena, Manchester, UK
06.12.2016 Motorpoint Arena, Nottingham, UK
08.12.2016 Barclaycard Arena, Birmingham, UK
10.12.2016 3Arena, Dublin, Ireland
12.12.2016 Newport Centre, Newport, UK
14.12.2016 The Brighton Centre, Brighton, UK
15.12.2016 SSE Arena, Wembley, London, UK

 

© 1999 - 2024 Entertainment Technology Press Limited News Stories